Our Office
Wolf Consulting, Inc.
3875 Franklin Towne Court
Suite 110
Murrysville, PA 15668
Click here for printed driving directions
In early February 2005, we moved to our new office in Murrysville, PA.
We occupy approximately 40% of the lower level of One
Franklin Towne Place -
a new 12,000 sq.ft. 2-story office building that was constructed
by DeCesare Corporation.
For 15 years, our office was located in Penn Hills (4 years
at the first location and 11 years at the second location).
Those offices served us well. But as we continued to grow,
it became harder to accommodate new staff, new equipment, and new client services. Our new home gives our staff more elbow room, allows for better workflow, and provides space for a dedicated computer test
lab (used to do quality-assurance tests on software upgrades and patches before we install them on clients'
networks). With a larger Conference Room, we will be doing more client training and offering seminars on
topics of importance to you. When you want to get off-site for strategic Information Technology planning,
we want you to feel welcome at our place.
While many IT companies are huddled in cramped, dark offices
with computers parts laying around everywhere, we wanted to take pride in offering our team members
and clients with a stimulating office environment. So we worked
with a local designer to blend form and function into a
stimulating environment. With warm earth-tone colors, wood
accents, and interior glass walls to allow natural light and
staff visibility, our new office is unique to our industry.
We invite you to tour our office to see where “your IT staff” calls home.
Please call us to schedule an appointment.
Below are some pictures that shows the construction progress
from March 2004 to February 2005.

March 28, 2004 View from corner. Getting started.... |

March 28, 2004 View from right side. Getting started.... |

May 1, 2004 View from corner. Excavation work started. |

May 1, 2004 View from right side. Excavation work started. |

May 11, 2004 View from corner. Excavation work continues. |

May 23, 2004 View from corner. Excavation work complete, starting the footing. |

May 23, 2004 View from right side.
Excavation work complete, starting the footing. |

June 6, 2004 View from corner. Concrete block wall getting started. |

June 6, 2004 View from right. Concrete block wall getting started. |

June 6, 2004 View from left. Concrete block wall getting started. |

June 26, 2004 View from corner. Concrete block wall complete. Steel beams and wood framing being erected. |

June 26, 2004 View from right. Concrete block wall complete. Steel beams and wood framing being erected. |

June 26, 2004 View from left. Concrete block wall complete. Steel beams and wood framing being erected. |

July 8, 2004 View from right. Concrete floor planks being set in place. |

July 8, 2004 View from left. Concrete floor planks being set in place. |

August 15, 2004 View from right. Getting started with wood framing on the upper level. |

August 15, 2004 View from left. Getting started with wood framing on the upper level. |

August 15, 2004 View from back. Getting started with wood framing on the upper level. |

August 23, 2004 View from corner. Wood framing erected on upper level. |

August 23, 2004 View from right. Wood framing erected on upper level. |

August 23, 2004 View from left. Wood framing erected on upper level. |

August 23, 2004 View from left. Wood framing erected on upper level. |

August 23, 2004 View of inside the lower level. We will occupy the far half of this level of the building. |

September 13, 2004 View from corner. Getting
started with the roof. |

September 13, 2004 View from left. Getting
started with the roof framing. |

September 13, 2004 View from back. Getting
started with the brick. |

September 14, 2004 View from front. Getting
started with the roof framing. |

September 19, 2004 View from corner.
Continuing to work on the roof. |

September 25, 2004 View from corner. Roof
completed. |

September 25, 2004 View from right. Roof
completed. |

September 25, 2004 View from left. Roof
completed. |

September 25, 2004 View from back. Brick
completed in the back. |

September 25, 2004 View of inside the lower
level. |

October 4, 2004 View of inside of our half
of the lower level. Getting started with wood framing. |

October 23, 2004 View from corner. Roof
shingles complete. Brick complete. |

October 23, 2004 View from front. Roof
shingles complete. Brick complete. |

October 23, 2004 View from left. Roof
shingles complete. Brick complete. |

October 23, 2004 View from inside, lower
lobby, at bottom
of the stairs. |

October 23, 2004 View from bottom of the
stairs, looking towards our office space. |

October 23, 2004 View of our office space,
from Receptionist desk area (Server Room at opposite
end). Wood framing complete. |

October 23, 2004 View of our office space,
from the Server Room area (Receptionist desk at
opposite end). Wood framing complete. |

November 18, 2004 View from right. Pouring
concrete sidewalk. |

November 26, 2004 View from corner. Blacktop
in parking lot partially complete. |

November 26, 2004 View from Receptionist desk area (Server Room at opposite
end). Drywall complete. Duct work started. |

November 26, 2004 View from the Server Room area (Receptionist desk at opposite
end). Drywall complete. Duct work started. |

December 12, 2004 View from corner. Parking
lot grading complete. No more mud. Yeah! |

December 12, 2004 View from inside,
lower lobby, at bottom
of the stairs. |

December 12, 2004 View of our entrance door
and waiting area, from inside,
lower lobby. |

December 12, 2004 View from Receptionist desk area (Server Room at opposite
end). Construction debris removed, primer coat of
paint applied. |

December 12, 2004 View from the Server Room
area (Receptionist desk at opposite end). Construction
debris removed, primer coat of paint applied. |

December 31, 2004 View from front. Main
entrance door hung. |

December 31, 2004 View from Receptionist
desk area (Server Room at opposite end). Wood trim
installed, ceiling grid hung. |

December 31, 2004 View from the Server Room
area (Receptionist desk at opposite end). Wood trim
installed, ceiling grid hung. |

December 31, 2004 View of our entrance door
and waiting area, from inside,
lower lobby. Laminate wood floor installed. |

January 18, 2005 View from Receptionist desk
area (Server Room at opposite end). Painting
complete. Carpet installed. Most lights and ceiling
tiles installed. |

January 18, 2005 View from the Server Room
area (Receptionist desk at opposite end). Painting
complete. Carpet installed. Most lights and ceiling
tiles installed. |

January 31, 2005 View from inside,
lower lobby, at bottom
of the stairs. |

January 31, 2005 View of our entrance door
and waiting area, from inside,
lower lobby. |

January 31, 2005 View from Receptionist desk
area (Server Room at opposite end). Ready for
furniture!. |

January 31, 2005 View from the Server Room
area (Receptionist desk at opposite end). Ready for
furniture! |

February 7, 2005 View from Receptionist desk
area (Server Room at opposite end, Network Engineer area
in the center). Furniture delivered, and we're
ready for business! |

February 7, 2005 View from the Server Room
area (Receptionist desk at opposite end, Network
Engineer area in the center.) Furniture delivered, and
we're ready for business! |

February 7, 2005 View of kitchen. |

February 7, 2005 View from corner of
Conference Room (oak table and shelves hand-made by
Lloyd's father-in-law). |

February 7, 2005 View of Craig's office
(Services Coordinator). |

February 7, 2005 View of Peter's office
(Senior Sales Consultant). |

February 7, 2005 View of Lloyd's office
(President). |
|
|
Make Wolf Consulting, Inc. your first call.
Wolf Consulting, Inc. is the premier
IT outsourcing company for small and mid-size businesses in the Greater Pittsburgh area. To become a client
or for more information about our services, call 724-325-2900 x4, or contact us
today.
|